Planned Water Supply Interruption on 29.04.2026
Dear consumers, We would like to inform you that on April 29, 2026, between 08:00 and 20:00, the supply of drinking water will be temporarily suspended in the following areas:
Spirin
Micro 15
Valincea (from Izvoarelor Street towards the outskirts)
In the Central sector, due to low pressure, water may not reach the upper floors of residential buildings (floors 7–9).
This measure is necessary due to the execution of works for connecting new equipment to the existing pipeline (suction line) within the SP-3 pumping station. The interruption is carried out by S.A. “Apă-Canal Cahul”, at the request of the contractor performing the works – “Polimer Gaz Conducte” LLC & “Irinda Prim” LLC.
We recommend that consumers ensure they have sufficient water reserves for this period. We apologize for the inconvenience caused and thank you for your understanding. These works are necessary for the efficient operation of the water supply system and for the continuous improvement of the service.