Lucrare_en_1
Lorem Ipsum has been the industry's standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled it to make a type specimen book_en
Lucrare_2_en
Many desktop publishing packages and web page editors now use Lorem Ipsum as their default model text, and a search for 'lorem ipsum' will uncover many web sites still in their infancy._en
Lucrare_3_en
If you are going to use a passage of Lorem Ipsum, you need to be sure there isn't anything embarrassing hidden in the middle of text. _en
Sistare programată
Valincea și Roșu
Avarie
fdafa
Avarie în satul Roșu
Stimați locuitori ai satului Roșu, Vă informăm că a fost înregistrată o avarie la sistemul de alimentare cu apă pe str. Ștefan cel Mare. În legătură cu aceasta, este necesară sistarea temporară a furnizării apei. Din păcate, la moment nu se cunoaște durata exactă a întreruperii, deoarece, din cauza condițiilor terenului avariat, sursa defecțiunii este dificil de depistat. Echipele de intervenție lucrează pentru remedierea problemei și identificarea cauzei în cel mai scurt timp posibil. Vom reveni cu informații actualizate pe parcurs.
Water Supply Interruption in Lapaevca Sector
Dear consumers, due to a failure in the water supply network on Sanatoriului Street, it was necessary to temporarily suspend the supply of drinking water for consumers in half of the Lapaevca sector. Intervention teams are already on site and are making every effort to repair the damage as quickly as possible and restore the service under normal conditions. Thank you for your understanding. For additional information or to report issues, please call: 0299 22000
Failure at Pumping Station No. 3
Dear consumers, We inform you that a leak has been detected on a D300 diameter pipeline within the territory of Pumping Station No. 3. In order to repair the failure and prevent additional losses, it is necessary to temporarily suspend the supply of drinking water. The entire Spirin sector will be affected. Intervention teams are working to eliminate the defect as quickly as possible and restore the service under normal conditions. Thank you for your understanding.
Planned Water Supply Interruption on 29.04.2026
Dear consumers, We would like to inform you that on April 29, 2026, between 08:00 and 20:00, the supply of drinking water will be temporarily suspended in the following areas: Spirin Micro 15 Valincea (from Izvoarelor Street towards the outskirts) In the Central sector, due to low pressure, water may not reach the upper floors of residential buildings (floors 7–9). This measure is necessary due to the execution of works for connecting new equipment to the existing pipeline (suction line) within the SP-3 pumping station. The interruption is carried out by S.A. “Apă-Canal Cahul”, at the request of the contractor performing the works – “Polimer Gaz Conducte” LLC & “Irinda Prim” LLC. We recommend that consumers ensure they have sufficient water reserves for this period. We apologize for the inconvenience caused and thank you for your understanding. These works are necessary for the efficient operation of the water supply system and for the continuous improvement of the service.
Temporary Water Supply Interruption
S.A. “Apă-Canal Cahul” brings to the attention of consumers that, due to a failure registered at 53 M. Frunze Street, the water supply will be temporarily interrupted. Affected areas (partially): Stefan cel Mare Street M. Frunze Street A. Mateevici Street 31 August Street Victoriei Boulevard B.P. Hasdeu Street Intervention teams are undertaking the necessary measures to remedy the failure and restore the water supply as soon as possible. Thank you for your understanding!
Water Supply Network Breakdown
We inform you that a breakdown has been detected on the D300 water pipeline located at 38 V. Stroescu Street. In order to carry out repair works, the drinking water supply will be suspended starting from 10:10. Consumers on the following streets will be partially affected: M. Basarab, V. Stroescu, Ștefan cel Mare, Tineretului, B.P. Hasdeu, 31 August, M. Frunze, A. Mateevici. The intervention teams are working to repair the damage as quickly as possible. Thank you for your understanding!
Scheduled water supply interruption for 05.05.2026
Consumers are hereby informed that on 05.05.2026, a scheduled water supply interruption will take place at Pumping Station No. 2 (SP 2) due to works for connecting the second electrical power transformer supplying the station. This intervention is part of the modernization process aimed at increasing the reliability of the station’s power supply system. The installation and commissioning of the second transformer will allow: ensuring a redundant power supply source, improving operational continuity in case of failures or maintenance works, stabilizing voltage parameters and reducing the risk of voltage drops or uncontrolled outages, enhancing the performance of electromechanical equipment (pumps, control panels, SCADA automation systems). From a technological standpoint, the connection of the new transformer involves: integration into the existing medium/low voltage power distribution scheme, synchronization and testing of electrical loads, verification of electrical protection systems and automatic transfer switch systems (ATS), calibration of monitoring and control systems. This investment is essential for increasing operational safety, reducing downtime, and ensuring a more stable and efficient water supply service for consumers.
NOTICE OF WATER SUPPLY INTERRUPTION
S.A. “Apă-Canal Cahul” informs consumers that, following the detection of a leak in the water supply network at 12 Independenței Street, Manta village, it is necessary to temporarily suspend the drinking water supply in the locality. In this context, the water supply will be interrupted for an undetermined period, until the repair works are completed and normal operating parameters of the network are restored. Intervention teams are already on site and are making every effort to locate the defect and fix it as quickly as possible. Thank you for your understanding, and we apologize for any inconvenience caused.
WATER SHUTDOWN IN MANTA VILLAGE
S.A. “Apă-Canal Cahul” informs consumers in Manta village that today, starting from 09:00, the water supply has been suspended due to a breakdown identified at the following addresses: 📍 Ștefan cel Mare Street 130 📍 B.P. Hasdeu Street 12 Intervention teams are working to repair the damage and restore the water supply as soon as possible. Thank you for your understanding!
Avarie in Focșa Sector
Dear residents of the Focșa sector, We inform you that a leak has been detected on P. Movilă Street in the water supply network, manifested by water emerging to the surface from the ground. Due to the necessary repair works, the water supply will be suspended starting from 08:30 for an indefinite period.
Water Supply Interruption on Water Main N2
Dear consumers, We inform you that due to a breakdown on Water Main N2 located on Nufărul Alb Street, the drinking water supply has been temporarily suspended. The following areas are affected: Lipovanca district City Center (partially) Intervention teams are working to repair the damage and restore the service as soon as possible. Thank you for your understanding.
a water supply occurred on the 300 mm diameter pipeline located on Vasile Lupu Street.
Dear consumers, We inform you that today, starting from 11:00 AM, a water supply occurred on the 300 mm diameter pipeline located on Vasile Lupu Street. At the moment, water is being drained from the network, after which welding and repair works will begin. The duration of the intervention is currently unknown. Due to the repair works, water supply is suspended for an indefinite period on the following streets: Vasile Lupu Street; Sanatoriului Street; Dunării Street (partially); Mihai Viteazu Street (partially). We apologize for the inconvenience caused and thank you for your understanding.
breakdown on water pipeline No. 2
Dear consumers, Due to a breakdown on water pipeline No. 2 with a diameter of D-500, water supply is suspended for an indefinite period. Water supply will be unavailable partially in the Ghidro, Lipovanca, and Centru sectors, as well as in the villages of Focșa and Roșu.
Water Supply Interruption Due to Emergency Repair Works
Dear consumers, Due to a detected failure in the water supply network, water delivery has been temporarily suspended on the following streets: A. Mateevici, Bălcescu, Frunze, Ștefan cel Mare (partially), Donici and Ion Vodă cel Cumplit. Repair crews are working to resolve the issue as quickly as possible.